Inspections
Sewer line installation, repairs, and maintenance
Properties connected to the Iowa Great Lakes Sanitary District system include Orleans, Okoboji, West Okoboji, Wahpeton, and surrounding county areas. Some connections also exist in Spirit Lake, Arnolds Park, and Milford. The Sanitary District staff can answer any connection questions.
If you expand a structure connected to the Sanitary District's system, a camera inspection of the sewer line is required. The Sanitary District staff must be present for this inspection to ensure the pipe is airtight, watertight, and has no issues.
To schedule an inspection, contact a local contractor with a sewer push camera. They will notify the Sanitary District to arrange the inspection. While property owners are encouraged to attend the inspection, it is not mandatory.
Sewer Backup
How to respond during an emergency
Sewer backups can occur for various reasons. If you notice a backup, first shut off all water going into the sewer drains. If the water recedes, the issue is likely with your private system—call a drain cleaning company or plumber for help. Causes may include blockages, tree roots, or collapsed lines. Sewer excavations in Okoboji, Wahpeton, West Okoboji, Orleans, or County areas connected to the Sanitary Sewer must be inspected—check Service Area Maps.
If water keeps rising after shutting off the water, call:
• Monday to Friday, 7:30 am to 4:00 pm: Sanitary District at 712-338-2626 ext 1
• Outside these hours or if no response: Dickinson County Dispatch at 712-336-2525
Industrial Discharge
Protecting our water quality
Iowa Great Lakes Sanitary District Ordinances
The Clean Water Act requires certain industries with potential wastewater impact to have discharge agreements with local treatment facilities. The Sanitary District collaborates with these industries and the Iowa DNR to ensure compliance and prevent hazardous discharges. Typically, a pre-treatment agreement is made and included in the Sanitary District's NPDES permit.
Sanitary District ordinances set limits on specific wastewater parameters. If discharges are likely to exceed these limits, a pre-treatment agreement may be required. Industries or commercial operations planning to discharge into the Iowa Great Lakes Sanitary District should consult with the Sanitary District about wastewater rules and regulations as soon as possible.
Treatment discharge agreements are different based on the industry and the constituents that discharge. Each agreement is based on its impact to the Sanitary District system. Testing is required for all discharges from industrial facilities. To find out what the specifics are for industrial facilities, please contact the Sanitary District Plant Superintendent.
Commercial operations may require special permits or treatment agreements for discharging to the public sewers. Before starting a commercial operation within the Sanitary District area to ensure that no special permit may be needed. Kitchen operations that require state permits are required to have a properly sized grease trap or grease interceptor. Contact the Sanitary District office and talk with the Collections System Superintendent or the District Superintendent for more information.