The equipment that keeps us running
Generating energy sustainably
The wastewater treatment facility (WWTF) is equipped with a modern backup power system centered around a new standby engine generator. This generator ensures the facility can continue operating during emergency situations like power outages or during times of high power demand from the electrical grid. Having reliable backup power is not just a convenience - it is essential for maintaining compliance with regulatory permits and environmental standards.
In 2020, the Trustees of the Iowa Great Lakes Sanitary District aimed to cut high electrical costs at the Wastewater Treatment Plant. A wind generator was not feasible due to the Milford Airport’s flight path. The goal of the solar project was cost reduction.
The University of Nebraska, Lincoln evaluated the plant’s power usage in 2018/2019, recommending power generation to further reduce costs. The Trustees collaborated with Milford Municipal Utilities and hired Zeigler Caterpillar for evaluation, engineering, and system design. They determined a 0.5-megawatt system based on 2018 and 2019 power usage. Only Caterpillar submitted a proposal, and the project began in 2020, with the solar array going online in 2021.
On the live solar page, accessible by the button below, the red line indicates the power needed to run the plant. The green line shows the solar power produced. Pink below the red line means power is used from Alliant Energy, gray under the red line indicates the solar array is powering the plant, and green above the red line means the Sanitary District is selling power back to Alliant Energy.
Critical control features
The facility’s operations are managed through an advanced computer system called Supervisory Control and Data Acquisition (SCADA). This system allows plant operators to monitor and control all treatment processes from centralized computer stations. Through these stations, operators can interact with multiple programmable logic controllers (PLCs) throughout the facility. This gives them the ability to monitor critical parameters in real-time, such as equipment status, water levels in tanks, flow rates through different processes, and make any necessary adjustments to optimize treatment.
Building expansions
The facility upgrade included the construction of three major new buildings, each serving distinct purposes. The Headworks Building contains essential preliminary treatment equipment for screening and grit removal. The Primary Treatment Building houses various types of sludge pumping equipment and thickeners, along with dedicated space reserved for future chemical storage needs. The Secondary Treatment Building is a two-story structure - its lower level contains sludge pumping equipment, while the upper level features a new laboratory and restroom facilities. The laboratory plays a crucial role in the facility’s operations, as staff regularly perform process control analysis there to verify compliance with discharge permit requirements and ensure optimal treatment performance.