Forcemain replacements
The Sanitary District has 64 lift stations, and with each lift station, there is a force main pipe through which the lift station pumps water. These pipes are as short as about 600 feet long, and some of them run a couple of miles. The force mains are a critical part of the lift station's operations. This project aims to replace the existing force mains through trenchless methods, most likely directional drilling. The funds allocated to this project are $1,000,000.
Pikes Point gravity sewer replacement
This project would replace all the gravity sewers from the Monarch Cove Area up to Pikes Point State Park. This would also include replacing the sewer force main. The project would replace about 3,3,00 feet of 8-inch gravity sewer, 17 manholes, and about 1,000 feet of force main sewer. The estimated cost for this project is $3,600,000
Jones Beach gravity sewer system
This project will replace the gravity sewer system in the Jones Beach area of West Okoboji. The goal is to replace at least 2,100 ft of 8-inch pipe and 10 manholes. Depending on factors at the time, the entire collection system of about 3,500 feet of 8-inch pipe and 17 manholes may be replaced. The estimated cost for this project is between $2,200,000 and $3,800,000.