2023 Capital Improvement Projects

The estimated cost for 2023 improvement projects is estimated to be around $19,000,000

Shop, lab and office improvements project

This project will start in the early summer of 2023.  The project was bid and awarded to Woodruff Construction from Spencer, Iowa.  The bid price is $14,938,769.00. The project will take between 18 to 24 months.  The project will remove the 1950s trickling filter tank/dome to make room for a new shop, wash bay, and cold storage area.  The project is also building a new office space for staff, a new conference room and will renovate the current office for a new laboratory to replace the lab that was built in the late 1970s/early 1980s.

Francis Site Hafer Point improvement project

During an inspection in 2022, the Sanitary District staff found a sewer pipe that was cracked and settled in the Francis Sites area.  The issue was found about 10 feet outside of an end manhole.  About 275 feet of 8-inch pipe was replaced with new C900 pipe and two manholes.  Six private sewer lines were reconnected as part of this project.  Landscaping installed over the sewer easement without permission of the Sanitary District Trustees had to be removed.  The landscaping that meets the easement requirements for this area was allowed to be installed at the property owners' cost.   BD Construction Service LLC from Spencer, Iowa, awarded the bid.  The bid price was $330,814.00.

Lift station improvements project

The study from 2022 will continue until 2023. The final work will determine the improvements to each lift station and the wastewater force mains.

South Center Core design

The South Center Core Project is scheduled to be started in 2024.  This project will look to install a new sewer line next to the existing sewer line from the wastewater treatment plant, north through Hunter Hills, Fairways At Emerald Hills South, Emerald Hill Golf Course, and Emerald Pines Subdivision.  The rough estimated price of this project is $19,000,000.

Orleans Lift Station design

The Orleans Lift Station, which is located on the south end of Big Spirit Lake, is the first lift station that will get improvements for the Spirit Lake Improvements project.  This lift station will go from a two-pump to a three-pump VFD lift station.  The lift station design will be similar to that of the Hayward Bay lift station built in 2021.  This lift station takes wastewater from about the north two-thirds of the City of Spirit Lake, all the wastewater from the Spirit Lake grade south to the Spillway on the west side of Big Spirit Lake, and from the south about 125th Street south to the Spillway on the east side of Big Spirit Lake.

This will include the replacement of the Orleans Lift Station Force Main.

Aerial map showing a large lake at the top with its shoreline outlined in yellow, indicating project areas for 2022 lift station improvements. Urban and rural areas are visible, with a legend and scale at the bottom.
Aerial map of a suburban area with a bold yellow line marking the route of CIP Projects for 2024 through residential, wooded, and open land. A yellow square legend indicates project areas. North arrow and scale included.