Lift Station study
This study evaluates the Ucempco Lift Station on Big Spirit Lake and East Okoboji Lake. The study will determine future capacity needs, pump sizing, force main sizing, possible elimination of a lift station, and possible relocation of two lift stations. When the study is completed, the project will replace pumps, process piping, and electrical systems and make minor repairs to structures, among other items. The Ucempco-style lift stations have been in operation for almost 50 years and, due to good maintenance, have lasted beyond the intended life span. The study for this project is not to exceed $341,700 and is being completed by Bolton and Menk Inc.
Plant clarifier improvements
This project is to rehabilitate three primary and three secondary clarifiers at the wastewater treatment plant (the circular items seen in the aerial photo). The drives and the mechanism inside the clarifiers will be removed. The drives will be refurbished when they are taken out. The mechanisms will be blasted to remove the paint, evaluated for damages, repaired if needed, and repainted. The troughs the water flows in will be grouted if necessary to remove low spots, and an epoxy liner will be added to preserve the concrete and make it easier to maintain. The bid price of the project is $1,384,000. And was awarded to John T. Jones Construction of Fargo, North Dakota.
This project, which cost $1,284,000, was completed in November 2022. It was completed on time and under budget.
Wastewater treatment plant facility plan and nutrient reduction study
This is a requirement by the Iowa DNR for evaluating nutrient reduction in the wastewater treatment plant discharge to Milford Creek. This needs to be done as required by the permit issued by the Iowa DNR for the Sanitary District to discharge treated wastewater into Milford Creek. This requirement is part of the Iowa Nutrient Reduction Strategy. Wastewater treatment plants are a small percentage of the nutrients in Iowa's waterway. Still, due to the fact they are permitted discharges and non-point water discharges such as storm sewers and tile outlets, wastewater treatment plants are required to make reductions.
The Sanitary District's discharge to Milford Creek is permitted by the Iowa DNR. As part of the Iowa Nutrient Reduction Strategy, wastewater treatment plants are required to reduce the amount of phosphorus and nitrogen discharged into streams. According to a graph by the USGS, Urban and population-related sources of nutrients were found to be 12% of phosphorus and 9% of nitrogen issues. This is a very small portion of the nutrients in Iowa's streams, which includes wastewater treatment plants. Since wastewater treatment plants are regulated for discharge, the limits can be required to be limited.
The report needs to be provided to the Iowa DNR by August 1, 2023. Bolton and Menk Inc. is completing this work for $123,500.
Collection system modeling
An updated collection system modeling will be completed to determine future project needs and evaluate the capacity for future developments. The previous modeling program was created by HR Green. Bolton and Menk was hired to update the model for the collection system at a cost of not to exceed $249,400.
Cold storage and shop, lab, and office improvements
This project will start by building a new cold storage unit on the property. The cold storage facility was built in the early 1950s and used a trickling filter system until the late 1970s. The structure was then used for cold storage. The building is falling apart and needs to be removed.
Following the construction of the new cold storage, the current cold storage facility will be demolished. A new shop will be added to the existing shop facility. The addition to the shop will house the vactor truck inside in a heated structure. Currently, the Vactor truck is winterized and then placed into cold storage, which causes issues when the truck is needed in the winter.
Along with the new shop, the lab and office will be renovated. The lab facilities are over 40 years old, and the lab needs to be updated with new testing requirements. An addition to the existing building will be house a new office area.