2021 Capital Improvement Projects

The estimated cost for 2021 improvement projects is estimated to be around $3,297,179.05

Center Lake improvements phase 2B

This project is the last phase of the Center Lake Improvements.  The project will extend sanitary sewer to 165th Street, 225th Place, and 231st Avenue properties.  This project will install 22 manholes and approximately 7,507 feet of 8-inch gravity sewer pipe.  This will be done with a pilot-tube micro-tunneling process.  The installation of this sewer will allow property owners to get off of septic systems linked to the water quality issues in Center Lake.  Minger Construction from Jordan, Minnesota was awarded the project with $6,122,777.50

Lakeshore Drive interceptor project

This project added around 1,800 feet of 8-inch sewer and four manholes to the gravity sewer system between Colcord's Point and Alexander Street in the City of Okoboji.  The project diverted water from the 1930s clay sewer line to the lake side of the house in the project area down Lakeshore Drive and connected to the new sewer line from the Center Lake Project Bid Package 3.  The purpose is to get the flow from the north collection areas out of the 8-inch clay line on the lakefront.  The reasons for this project are that the pipe has developed a belly that has reduced capacity, one manhole has a bypass that goes into West Okoboji, and the pipe is in a high bank area near the lake, which could collapse over time.  The sewer was installed with the pilot tube micro-tunneling method, the casing pipe was left installed, and the C900 pipe was strung through the casing pipe.  Drops were added at manholes for residents to connect to in the future. The Minger Construction from Jordan, Minnesota, was awarded the project with the bid price of $1,994,240.00.

Lakeview Drive improvements

The Sanitary District partnered with the City of Wahpeton on a road infrastructure improvement project.  The City would replace their road, water mains, and storm sewer on Edgewood Drive and Lakeside Avenue.  The City of Wahpeton's project was replacing the road over the sewer on Lakeside Avenue, and this is where the two entities partnered for the improvements.  The Sanitary Districts part of the project was to install a new gravity sewer to the lift station, replace manholes, and replace the sewer force main within the project area.  The City of Wahpeton led the contract, and the Sanitary District was only an alternate part of this project.  The City of Wahpeton awarded the contract to Hulstein Construction and the Sanitary District as part of the project, which cost $584,383.50 for the sewer construction.  The Sanitary District will also pay the City of Wahpeton $250,000 for road repairs.

Sunset Drive improvements

The Sanitary District partnered on a street and infrastructure improvements project with the City of Orleans.  The City of Orleans was replacing its road, water mains, and storm sewer on Sunset Drive and Center Drive.  The Sanitary Districts' part of the project was to install new gravity sewers and manholes within the project area.  The City of Orleans led the contract, and the Sanitary District was only an alternate part of this project.  The City of Orleans to Valley Construction and the Sanitary Districts awarded the contract, and part of the project was $291,555.55 for the sewer construction.  The Sanitary District will also pay the City of Orleans $177,000 for road repairs.