Solar Project at Waste Water Treatment Plant
As of 9/16/2020, the first solar panels are being added to the racking. This is the first of eight rows that will be added.

First solar panels going up on the racking at the Waste Water Treatment Plant. (9/16/2020)
The Solar Project at the Iowa Great Lakes Sanitary District Waste Water Treatment Plant started Construction on Tuesday, September 8, 2020. The project will continue over the next several weeks. The Solar Project will provide up to 0.5 megawatts of power to offset the power cost for the Wastewater Treatment Plant. The payback is estimated to be about 7 years.
The wastewater Treatment Plant is located near the outlet of Lower Gar on 28th Street in Milford. It takes wastewater from Orleans, Spirit Lake, Okoboji, Arnolds Park, West Okoboji Wahpeton, Milford, and unincorporated areas around the Iowa Great Lakes. The plant treats about 2.5 million gallons of wastewater a day and discharges the treated water to Milford Creek.

Support Post for the Solar Panels Being Installed

Off loading the first pallet of Solar Panels 9/10/2020