Center Lake Phase 1A – Haywards Bay Lift Station Relocation

This project was to replace and relocate the Haywards Bay Lift Station.  The old lift station was built in 1939 and was located around 150 feet from the shoreline of West Okoboji.  The lift station has been modified a few times over the years, and with the expansion of the collection system, this lift station needed a significant improvement.  The Sanitary District worked with the Iowa Department of Natural Resources to relocate the lift station on the edge of a wildlife management area.  The contract was awarded to Grundman-Hicks LLC, and the project cost $2,258,994.68.

East Lake interceptor project

This project was to improve the East Lake Interceptor installed in the late 1970s and early 1980s. It worked in two areas: the first was south of Bridges Bay Resort, and the second was in Oar's Campground. The project added a slope to the pipe to increase capacity in the north construction area. The pipe route was changed in the south construction area, and the pipe slope was improved to create more capacity. The contract was awarded to H&W Contracting, and the final project cost was $1,629,533.69.

Wastewater treatment plant solar project

This project was to offset continually increasing power costs. Ziegler Energy Solutions LLC submitted the proposal to install a solar panel system for the plant. To learn more about the solar project or to see live power generation and power demand, check the Solar Project Link.